Today's Training Topic: Fire/Water Resistance And Competitive Edge Of Smart Locks

Jul 04, 2025

Leave a message

Product fireproof and waterproof performance and planning
1. Analysis of fireproof and waterproof performance

  • Fireproof requirements for smart door locks: meet the fire resistance test of the entrance door (such as EN 1634, UL 10C) to ensure that you can still escape in the event of a fire.
  • Certification (such as CCCF, UL): continuous compliance and high market recognition.
Tenon smart
Tenon

 

Our product advantages:

Door categories: full range of fireproof (armored door + fireproof core), waterproof, dustproof, no additional modification required.

Lock category:

  • Fireproof: steel plate structure + fireproof design, passed integrity test.
  • Waterproof: default IPX4 (splashproof), can be upgraded to higher protection (such as IPX6).

Tenon-smart-lock

smart-door-Tenon

 

2. Product planning and innovation direction

  • Smart window (under development);
  • Market potential > smart door > smart lock;
  • The first generation of products will be launched soon, focusing on low-cost intelligent switches, with significant price advantages;
  • Smart door leaf (DIY solution): integrated smart door leaf, which can replace old doors and reduce installation costs (suitable for overseas markets with high labor costs);
  • Smart sun door (future exploration),Combine lighting and intelligence to expand the high-end market.

 

Armored door core selling points:

  • Luxurious atmosphere - improve the grade of the residence;
  • Sound insulation and heat insulation - better than traditional steel doors;
  • Super durable - no deformation after long-term use;
  • Security guarantee - anti-pry and anti-theft design;
  • Buy 1 and enjoy 5 - super value supporting services;
  • Lifetime maintenance (domestic exclusive);
  • Affordable price - high-end quality, mid-range pricing.

smart-door

Factory reform and delivery optimization

  • Talent upgrade: introduce professional and excellent teams and optimize management structure.
  • Independent quality inspection: strictly control the production process and reduce after-sales problems.

 

Delivery commitment:

  • Before August: within 50 days (transition period).
  • After August: significantly shortened (target within 30 days).

 

Send Inquiry